UNDERGROUND FIRE WATER TANK CONSTRUCTION
UNDERGROUND
FIRE WATER TANK
CONSTRUCTION
AIRSIDE ROAD STRENGTHENING
& RE-CARPETING
Client: S.S. Mali
Area: 28,223 sq.ft
Duration: 1 Day
Executed complete bituminous road
resurfacing between the apron and terminal
within a single-day airport maintenance
window. Coordinated efficiently with airport
authorities, ensuring high-quality finish,
zero operational disruption, and strict
adherence to safety protocols.
Client: Prime Construction
Capacity: 5,00,000 Litres
Duration: 6 Months
Constructed an RCC underground water
tank with waterproofing and partition
chambers for fire and AC systems.
Achieved leak-proof integrity, structural
stability, and compliance with airport
engineering standards within the given
timeframe.